The Cybercab story just went global. Since ENN’s last update, when MKBHD posted his confirmed $29,990 Cybercab order and Musk called him “a chicken”, Tesla has made its biggest Cybercab manufacturing move yet outside the United States. On November 16, Tesla announced it will invest €3 billion, approximately $3.3 billion, to expand its Gigafactory in Grünheide near Berlin, its only vehicle manufacturing site in Europe.1 Electrek describes it as a first €3 billion investment in a new production building designed for up to 1 million Cybercabs a year, with production planned for 2029.2
What Tesla announced
The money funds a major new production building, roughly twice the size of the existing main hall, plus supporting infrastructure that includes an additional wastewater treatment plant.1 According to Tesla’s statement as reported by Electrek, the new hall sits north of the existing plant and comes with ancillary buildings and a second wastewater treatment plant.2
Once fully scaled, the facility is designed to produce up to one million Cybercabs annually, alongside continued Model Y output.1 Tesla says it will be “the technologically most advanced Tesla factory in the world.”2

What Tesla’s team said
Plant manager André Thierig announced the decision on X after Tesla told employees on Monday.2 His post was pure enthusiasm:
We are expanding! Cybercab production is coming to Giga Berlin!
That post is quoted in Electrek’s report.2 The news had leaked a few hours earlier: Steven Scholtysek, an automation engineer at the plant, posted that Elon Musk personally signed off on the project last week and that the new hall will be bigger than the original factory.2
The land and the ambition were already in place. Tesla laid out a plan to take Giga Berlin to 1 million vehicles a year in its 2023 permit filings and has been clearing land for it since.2 What is new is the product: until now, Tesla had only said the second hall would not be another Model Y factory.2
The timeline, step by step
Tesla plans to file the building permit application before the end of 2026, according to Tagesspiegel as cited by Teslarati, drawing on the broader 2023 expansion application that targets one million vehicles per year overall.1 From there:
- End of 2026: building permit application filed.1
- First half of 2027: construction begins.1
- 2029: Cybercab production starts.1
- Full scale: capacity of up to one million Cybercabs a year.1
The company is already recruiting several hundred workers for construction and production planning.1 Brandenburg officials have welcomed the investment as a significant economic boost that creates hundreds of new positions and strengthens the region as a manufacturing hub.1 That stands out against a broader German automotive industry facing high costs, weak demand and job cuts.1
Giga Berlin is already on a roll
The Cybercab hall lands on a plant that is growing. Giga Berlin employs about 12,600 people after recent hiring of roughly 2,000, and it is ramping Model Y production toward 7,500 vehicles per week, around 375,000 a year.1 Electrek notes Tesla has been hiring there again this year as European demand came back.2
Batteries are moving in too. Just days earlier, on November 11, Thierig said at the Automobilwoche Congress that full battery cell production at Grünheide is on track for mid-2027.1 The factory already produces electrodes, which are currently shipped to Texas for cell assembly and returned; the goal is to complete 4680-format cells on site using Tesla’s dry-electrode process, targeting up to 18 GWh a year.1 Investment in the cell operation approaches €1 billion and is expected to create more than 1,500 jobs.1
Teslarati reports that once that cell operation is running, Giga Berlin would become the first plant in Europe to produce everything from battery cells to finished vehicles under one roof, raising the European content of its Model Ys to roughly 90 percent.1 Taken together with the Cybercab hall, Teslarati says the moves deepen vertical integration and reduce dependence on transatlantic and Chinese supply chains.1

How it fits the Cybercab push
Tesla is prioritizing Cybercab production as it plans a fleet of fully autonomous vehicles without steering wheels or pedals across the world.1 Teslarati frames the Berlin investment as part of Tesla’s strategic pivot toward autonomy and robotaxis: adding major European capacity diversifies production beyond the United States and supports Elon Musk’s vision of autonomous vehicles making up the majority of Tesla’s future output.1
The American side of the story has been moving all year. In February, Tesla posted a photo it captioned “First Cybercab off the production line at Giga Texas.”3 By June, factory observer Joe Tegtmeyer reported more than 150 Cybercabs driving or parked across the Austin campus, some with no steering wheel at all and others with temporary steering wheels used to collect driving data.4 Electrek reports that Texas production started in April and that 463 Cybercabs were registered there as of late October.2 Tesla has also opened personal Cybercab orders at $29,990 plus a mandatory $299 monthly subscription, usable only inside its Robotaxi geofences.2 ENN covered those terms in the ownership agreement story and the $29,990 launch price.
The European rulebook question
Electrek, which takes a skeptical view, points to a real hurdle. Under current EU rules, a driverless vehicle model is capped at 1,500 registrations a year through a “small series” type-approval scheme.2 Tesla also has no approval anywhere in Europe for its software to drive without supervision; the Dutch RDW approved the supervised version, called Tesla Assisted Driving, and nine other countries recognize that approval.2 Electrek also argues the plant never reached the 500,000 units a year Tesla promised when it opened in 2022.2
The same report lays out why the bet can make sense. Rules can move in three years: the European Commission has said it wants large-series approval for other driverless uses, and a UN regulation for automated driving systems is in the works.2 In March, the Commission already lifted the cap for automated valet parking.2 And Tesla could export Cybercabs from Berlin.2 Teslarati adds that local cell production positions Giga Berlin as a more self-sufficient European base as regulatory and market conditions favor higher local content.1 Tesla is building for 2029, not for today’s rulebook.
What to watch next
- The permit filing, which Tesla plans before the end of 2026.1
- Groundbreaking in the first half of 2027.1
- 4680 cell production at Grünheide, on track for mid-2027.1
- EU and UN rule changes for large-series driverless vehicles.2
- Cybercab deliveries in Texas, where personal orders are already open.2
The Cybercab began as a Giga Texas product. With a first €3 billion committed and a hall planned at twice the size of Berlin’s main building, Tesla is now setting up a second home for it in Europe.1



